MY字典>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • Whatever happens, you have to dam up your feelings.
    无论发生什么,你必须控制住感情。
  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
    基于时间序列分解法建立大坝变形预测模型。
  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • After the two solutions, in down dam selection it is also under the same technical and economic comparison of the dam with the up dam, finally the concrete arch dams is selected.
    在选定这两个方案后也是通过和在上坝址选择过程一样的方法对下坝址进行了技术经济比较,最终选定下坝址以混凝土拱坝为代表坝型。
  • Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
    随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。
  • The analysis of planting trees to the different discharge in same base slopes at the same time mean velocity in section before and after explained vegetation dam can let up average current velocity in front and inside of dam, and turn the current velocity peak value even.
    同时通过对相同底坡不同流量下植树前后断面平均流速的分析,说明了植物坝能较好的减小坝前和坝内的水流平均流速,并将流速峰值均匀化。
  • This dam backs up the water to prevent floods.
    这个坝可以拦住水,以防泛滥。
  • In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
    本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数;
  • The basic conditions, which the dam system can come up to relative stability, are as follow.
    坝系要达到相对稳定,最基本的条件有3个:一是相对稳定系数必须大于或等于一定的允许值,这是坝系要达到相对稳定的关键;
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。